Subject: Complete fabrication of port facilities
Period: 2020
Scope: Production of 5 pcs. port facilities type "buoy" with a total weight of over 100 tons, installation of solar and navigation equipment.
Subject: Complete fabrication of port facilities
Period: 2020
Scope: Production of 5 pcs. port facilities type "buoy" with a total weight of over 100 tons, installation of solar and navigation equipment.
Subject: Fabrication and installation of chimneys, air ducts and flues
Period: 2020
Scope: Production and installation of chimney, air ducts for cooling and fuel air and flue gas ducts for new lime kiln.
Subject: Manufacture of safety equipment
Period: 2019
Scope: Fabrication of steel safety equipment - donut type fender
Subject: Production of Steel Fenders
Period: 2019
Scope: Fabrication of 112 pcs. steel fenders, installation of facing polyethylene plates.
Subject: Production of steel safety fenders with torsion mechanism
Period: 2019
Scope: Fabrication of 5 pcs. steel fenders with torsion mechanism, allowing directing of the equipment, installation of facing polyethylene plates.
Subject: Fabrication of steel buoy
Period: 2019
Scope: Production of steel buoy from sheet construction.
Project site: "Mondi Stambolijski" ЕАD
Year of completion: 2018
Scope of works: Engineering of stainless steel tanks, dilution devices and pipe equipment, manufacturing of stainless steel tanks during factory operation, fabrication of half-finished materials for the stainless steel tanks, fabrication and installation of the tanks as steel rolls, which after unrolling and welding on site formed the tanks.
Project site: "Mondi Stambolijski" ЕАD
Year of completion: 2018
Scope of works: Dismantling of an old tank, manufacturing and installation of a new stainless steel sulphur acid tank
Subject: Fabricated steel closed box torsion arm fender panel with torsion arm assembly
Year of completion: 2018
Scope of works: Fabrication of steel fender panel with torsion arm for the panel's motion, mounting of polyethylene sheets
Year of completion: Ongoing since 2017
Scope of works: Fabrication of stacks, ducts, elbows, aspirators for modular asphalt-mixing plants for Germany
Subject: Fabrication of steel fender panels assembled with torsion arms
Year of completion: 2017
Scope of works: Fabrication of plate and tubular steel structures, representing steel fender panels – fender panels with torsion arms allowing the motion of the panels, assembly of protective polyethylene sheets.
Subject: Manufacturing of stainless steel tank for technological purposes
Year of completion: 2017
Scope of works: Manufacturing of stainless steel tank for softening installation – town of Stara Zagora
Project site: „Arsenal“АD
Year of completion: 2017
Scope of works: Manufacturing of carbon steel technological tanks – 4pcs.
Subject: Manufacturing of stainless steel technological tanks
Year of completion: 2017
Scope of works: Manufacturing of stainless steel tanks – 2pcs for technological purposes.
Subject: Manufacturing of plate steel structures – prefabricated housings of filtering systems
Year of completion: 2016 - 2017
Scope of works: Manufacturing of plate steel structures, comprising steel sidewalls for sectional housings of filtering systems which are part of asphalt mixing plants.
Subject: Fabrication of stainless steel components for filtering systems
Year of completion: 2016 – 2017
Scope of works: Fabrication of stainless steel technological doors (closure heads) for filtering systems which are part of asphalt mixing plants, mounting of rock wool insulation, overall assembly.
Subject: Fabrication of plate works – steel pontoons
Year of completion: 2016
Scope of works: Fabrication of steel pontoons assembled with rubber protective elements.
Project site: „Yagoda Med“ Hospital
Year of completion: 2016
Scope of works: Fabrication, delivery and installation of mineral and potable water stainless steel tanks, mounting of rock wool insulation and cladding of galvanized steel sheet.
Subject: Fabrication of plate works – mooring buoys
Year of completion: 2015 - 2016
Scope of works: Fabrication of steel mooring buoys and ancillary equipment.
Subject: Fabrication of steel components for sand filters
Year of completion: 2015
Scope of works: Fabrication of steel housings for sand filters
Project site: "Saint Gobain Construction Products Bulgaria" ЕООD
Year of completion: 2014-2015
Scope of works: Design, fabrication, delivery and installation of 70m3 dried cement storage steel silos - 2pcs, fabrication and installation of bearing steel structure, installation of the adjacent technological equipment - filters, screw conveyors, flaps, aeration systems.
Project site: "KCM" АD
Year of completion: 2013
Scope of works: Fabrication, delivery and installation of dewatering bunker, flap, hydraulic station and steel pipelines.
Object: "FLSmidth Airtech" A/S
Implementation period: 2013
Scope: Fabrication of sheet and profile steel structures for gas ducts, compensators, gas duct supports.
Оbject: "ZKI Volta" OOD
Implementation period: 2013
Scope: Fabrication of sheet steel structures for cyclone batteries, control assembly and fabrication at company's workshop.
Subject: Fabrication of steel fenders
Year of completion: Ongoing since 2012
Scope of works: Fabrication of plate steel structures, comprising protective steel panels – fenders, assembled with polyethylene sheets.
Project site: "Zagorka" АD
Year of completion: 2012
Scope of works: Design, fabrication, delivery and installation of 110m3 hot water stainless steel tank.
Project site: "Amylum Bulgaria" ЕАD
Year of completion: 2012
Scope of works: Fabrication and delivery of 6pcs of stainless steel and carbon steel tanks with the following capacity – 10m3 - 3 pcs., 20m3 – 1pc., 30m3 -1pc., 50m3 – 1pc.
Project site: "Gips" АD
Year of completion: 2011
Scope of works: Fabrication, delivery and installation of gypsum storage steel silo.
Project site: "Ognyanovo-К" АD
Year of completion: 2011
Scope of works: Fabrication and installation of second lime kiln structural steel. Fabrication and installation of staircases, platforms and walkways. Manufacturing of the kiln in separate prefabricated components, site delivery and erection of the overall equipment.
Project site: "Kamenitza" АD
Year of completion: 2010-2011
Scope of works: Design, fabrication and installation of brewery pulp storage vertical silos, mounting of screw conveyors, equipment and automation.
Project site: "Rubin" АD
Year of completion: 2009 - 2010
Scope of works: Fabrication and installation of main raw materials steel storage vertical silos in a new “Materials shop” part of “Rubin” AD glass factory
Project site: "Bulgargas" ЕАD
Year of completion: 2005
Scope of works: Fabrication of plate works for dust-collectors, final and complete assembly at the production plant of the company.