Project site: "Mondi Stambolijski" ЕАD
Year of completion: 2018
Scope of works: Engineering of stainless steel tanks, dilution devices and pipe equipment, manufacturing of stainless steel tanks during factory operation, fabrication of half-finished materials for the stainless steel tanks, fabrication and installation of the tanks as steel rolls, which after unrolling and welding on site formed the tanks.