Dismantle of structural steelwork from Germany and installation of the same in Bulgaria

Object: "Ceramics House" EOOD

Implementation period: 2006-2007

Scope: Dismantle of production lines for ceramic products from Germany, second installation in Bulgaria at the territory of the plant for ceramic products Straldja city.