• +359 42 622 755
  • zapitvania@montage-engineering.com

Select your language

  • Български език
  • English (UK)
Montagengineering JSC
  • Home
  • About us
    • Activity
    • Factory
      • Plate steel processing
      • Structural steel processing
      • Assembly and welding activities
      • Application of anti-corrosion coatings
    • Equipment
    • Catalog
    • Certificates
    • Рrizes and distinctions
  • Steel Structures
  • Structural steelwork
  • Electrical
    • Building electrical installations
    • Industrial electrical installations
    • Lighting installations
    • Earthing and lightning protection installations
  • Projects
    • Steel Buildings
    • Structural steelwork
    • Mechanical installation works
    • Electrical installation works
  • Useful
  • Contacts

Tanks and silos

Pyrolysis oil tank

Pyrolysis oil tank

Tanks and silos

Subject: Construction of a vertical steel tank with a capacity of 500 cubic meters.
Implementation period: 2015
Scope: Production and installation by roll method of a vertical steel tank with a capacity of 500 cubic meters, made of carbon steel for storage of pyrolysis oil.

Read more …
Production and installation of stainless steel tanks for technological needs

Production and installation of stainless steel tanks for technological needs

Tanks and silos

Object: Mondi Stamboliiski EAD
Implementation period: 2018
Scope: Production of blanks and construction of stainless steel tanks and mechanical installation.

Read more …
Fabrication of steel silos

Fabrication of steel silos

Tanks and silos

Object: "CBMI Construction Co. Ltd - branch Bulgaria"

Implementation period: 2014

Scope: Fabrication and erection of 2 pcs steel silos for project: "New production line of Devnya Cement".

Read more …
Fabrication of steel tank

Fabrication of steel tank

Tanks and silos

Object: "Mondi Stambolijski" EAD

Implementation period: 2011

Scope: Fabrication of carboon steel tank on existing tank Т11 at "Chemical workshop".

Erection of vessels for hot water

Erection of vessels for hot water

Tanks and silos

Object: "Kamenitza" AD

Implementation period: 2008

Scope: Reparation, installation and commissioning of 4 pcs. tanks for hot water with capacity 70 m3.

Read more …
Fabrication and erection of stainless steel tank

Fabrication and erection of stainless steel tank

Tanks and silos

Object: "Amilum Bulgaria" AD

Implementation period: 2007

Scope: Fabrication, delivery and erection of stainless steel tank with capacity 500 m3.

Fabrication and erection of stainless steel tank

Fabrication and erection of stainless steel tank

Tanks and silos

Object: "Mondi Stambolijski" EAD ENG

Implementation period: 2006

Scope: Fabrication and erection of stainless steel tank with capacity 100 m3.

Complete reparation and reconstruction of tanks for petrol products storage to State Agency "State reserves and war-time provisions"

Complete reparation and reconstruction of tanks for petrol products storage to State Agency "State reserves and war-time provisions"

Tanks and silos

Object: "Petrol base Sliven"

Implementation period: 2006

Scope: Complete reparation of steel tanks for petrol products storage with capacity 3 pcs. each 5 000 m3 and 1 pcs. - 50 000 m3, replacement of mantels, bottoms, roofs, pump replacement, steel pipelines and fire protection system.

Construction of raw oil production plant - Kostinbrod

Construction of raw oil production plant - Kostinbrod

Tanks and silos

Оbject: "New Oil" AD

Implementation period: 2014-2015

Scope: Fabrication and erection of stainless steel vertical tanks for raw sunflower oil with capacity 500 m3.

 

Design and construction of stainless steel vessel for dense black liquor storage

Design and construction of stainless steel vessel for dense black liquor storage

Tanks and silos

Оbject: "Mondi Stambolijski" EAD

Implementation period: 2015

Scope: Design, fabrication and erection of stainless steel silo for dense black liquor storage with capacity 400 m3.

Read more …
Construction of air separating instalation

Construction of air separating instalation

Tanks and silos

Оbject: "Linde Gas Bulgaria" EOOD

Implementation period: 2007

Scope: Erection of horizontal and vertical carbon steel tanks.

Read more …

Copyright Montagengineering JSC © 2007–2022

web design M-Design

  • Home
  • About us
    • Activity
    • Factory
      • Plate steel processing
      • Structural steel processing
      • Assembly and welding activities
      • Application of anti-corrosion coatings
    • Equipment
    • Catalog
    • Certificates
    • Рrizes and distinctions
  • Steel Structures
  • Structural steelwork
  • Electrical
    • Building electrical installations
    • Industrial electrical installations
    • Lighting installations
    • Earthing and lightning protection installations
  • Projects
    • Steel Buildings
    • Structural steelwork
    • Mechanical installation works
    • Electrical installation works
  • Useful
  • Contacts
We Value Your Privacy

We use cookies to enhance your experience and for traffic analysis. By continuing to visit this site you agree to our use of cookies.