Construction of a new service stairwell of steel construction

Read more ...

Object: Imeris Minerals Bulgaria AD

Period: 2021

Scope: Production and installation of new stairwells, including new stairwells, railings, platforms and flooring from grilles.

Reconstruction of an open reinforced concrete trestle with new load-bearing metal structures

Read more ...

Object: Aurubis Bulgaria AD

Period: 2021

Scope: Production and installation of new load-bearing steel beams, restoration and rehabilitation of remaining steel and reinforced concrete elements, dismantling of existing load-bearing reinforced concrete panels.

Load-bearing metal structure for control screening installation

Read more ...

Object: Ognyanovo-K AD

Period: 2020-2021

Scope: Production and installation of metal structure for control screening installation, including fabrication and installation of stairs, platforms and railings, corrugated sheet metal flooring, installation of roofing sheet metal.

Reconstruction of service stairs and handrails

Read more ...

Object: Imeris Minerals Bulgaria AD

Period: 2020

Scope: Production and installation of new steel stairs, railings and platforms to provide access

Production of steel paths and platforms for port terminal

Read more ...

Object: Port terminal

Period: 2020

Scope: Production of steel structures for paths and access platforms.

Load-bearing metal structures for the reconstruction of a bridge over the Maritsa River, Simeonovgrad

Read more ...

Object: Steel bridge over the Maritsa river

Period: 2019

Scope: Production and installation of load-bearing metal structures and individual elements for the reconstruction of a steel bridge, delivery and installation of flooring from lattice grills.

Dismantling, relocation and installation of wood crushing installation

Read more ...

Project site: „Kronospan Bulgaria” EOOD
Year of completion: 2017
Scope of works: Overall dismantling, transportation and reinstallation of the wood crushing installation and conveyors.

Erection of sunflower oil refinery

Read more ...

Subject: Overall erection of sunflower oil refinery – structural steelwork, steel pipelines, equipment
Year of completion: 2016 - 2017
Scope of works: Overall erection of sunflower oil refinery which includes: installation of steelwork, technological carbon steel pipelines, stainless steel pipelines, Mechanical installation and overall electrical installation works.

Overall erection of electrolyte secondary washing installation

Read more ...

Project site: „Aurubis Bulgaria” AD
Year of completion: 2016
Scope of works: Mounting of industrial steel structure, mounting of mechanical installation works and tanks, delivery and installation of technological steel pipelines, mounting of insulation and cladding on the different type of equipment.

Installation of stainless steel pipelines and equipment for a new spirit production plant

Read more ...

Project site: "Zaharni Zavodi“АD
Year of completion: 2016
Scope of works: Delivery and installation of stainless steel pipelines, mechanical installation, certification of stainless steel vessels.

Complete construction of raw oil production plant - Kostinbrod city

Read more ...

Object: "New Oil" AD

Implementation period: 2014-2015

Scope: Structural steelwork - elevators, screws, redlers, hoppers and inflows, separators, stubble cleaner, sunflower press, precipitants and filters for raw oil, pumps, etc.

Structural steelwork

Read more ...

Object: "CBMI Construction Co. Ltd - branch Bulgaria"

Implementation period: 2014

Scope: Installation of structural steelwork , belt conveyors, bag filters, mills, crushers for project "New production line of Devnya Cement".

Production of bag filters

Read more ...

Оbject: "New Energy Systems" EOOD

Implementation period: 2014-2015

Scope: Fabrication of housing and separate elements for bag filter for installation for technical carbon processing.

Structural steelwork

Read more ...

Object: "Linde Gas Bulgaria" EOOD

Implementation period: 2013

Scope: Structural steelwork installation and vessels for gaseous oxygen production installation at the territory of "KCM" AD.

Structural steelwork

Read more ...

Object: "Evricom" EOOD

Implementation period: 2013

Scope: Delivery, installation and commissioning of Structural steelwork - mixing block, production line for cutting wax mixtures, stainless and carbon steel pipelines.

Mechanical equipment installation and industrial steel pipelines

Read more ...

Object: "Panchim" EOOD

Implementation period: 2013

Scope: Expansion of granules production for polymethylmethacrylate, including fabrication and erection of steel structures, installation of mechanical equipment and steel pipelines, equipment for waste water treatment plant.

Fabrication of sheet and profile structural steelwork for electrostatic precipitators

Read more ...

Object: "FLSmidth Airtech" A / S

Implementation period: 2013

Scope: Production of sheet and profile metal structures for gas ducts, compensators, gas duct supports for electrostatic precipitators.

 

Equipment installation

Read more ...

Object: "Agria" AD

Implementation period: 2012

Scope: Delivery, installation and commissioning of service pumps.

structural steelwork

Read more ...

Object: "Neochim" AD

Implementation period: 2012

Scope: Energy efficiency improvement and emission reduction of СО2 of installation АМ-76, installation of steam heater, separator installation.

Construction of New lead production

Read more ...

Object: "KCM" AD

Implementation period: 2012-2014

Scope: Complete performance of part "Mechanical-technological", installation of kiln, boiler, burners, vessels, gasducts and dust-collection equipment, condensers and deairators, all steel pipelines, pumps and fitting.

Overall installation of technological equipment and steel pipelines

Read more ...

Project site: „Maritza Olio“ АD
Year of completion: 2012
Scope of works: Implementation of complex installation of mechanical installation works, carbon (black)  steel pipelines, stainless steel pipelines, fire-extinguishing installation, hexane storage tanks, Electrical installation works.

Production and installation of electrostatic precipitator

Read more ...

Оbject: "KCM Technology" EOOD

Implementation period: 2012

Scope: Production and installation of new electrostatic precipitator for the needs of "KCM" AD, according to project of "FL Smidth" - Denmark.

Design, fabrication and erection of mechanical equipment

Read more ...

Object: "Duropack Trakia Papir" AD

Implementation period: 2011

Scope: Design, fabrication, delivery and erection of waste transportation installation.

Construction of installation for calcification of natural gypsum

Read more ...

Object: "Gips" AD

Implementation period: 2011

Scope: Structural steelwork - screws, redlers, elevators, specialized equipment, hoppers, silos and inflows.

Production and installation of second limestone kiln

Read more ...

Object: "Ognyanovo-K" AD

Implementation period: 2011

Scope: Fabrication and erection of nonstandard equipment - limestone kiln and its attached equipment, hoppers, silos, valves, filters, steel pipelines.

Installation of mechanical equipment

Read more ...

Object: "Rubin" AD

Implementation period: 2010

Scope: Installation of tunnel kiln for glass plant.

Dismantle and erection of mechanical equipment, reparation of transport equipment

Read more ...

Object: "Mondi Stambolijski" EAD

Implementation period: 2010

Scope: Displacement of grinder "Norman" at new position, reparation of existing conveyors for biomass.

Dismantle and erection of steel structures and mechanical equipment

Read more ...

Object: "Emka" AD

Implementation period: 2010-2011

Scope: Dismantle of enamel machine and steel structures around it, fabrication and erection of service platforms around equipment, installation of enamel machine.

Installation and equipment completion of mechanical installation

Read more ...

Object: "Ooms International", Bulgaria

Implementation period: 2010

Scope: Erection of mobile installation for production and modified bitumen, fabrication of steel structure for tank frame, complete equipment completion and assembly of installation and transport preparation.

Construction of a system for transportation and operation of coal and limestone

Read more ...

Object: "Sandvik Bulgaria" EOOD

Implementation period: 2009 - 2010

Scope: Erection of steel structures for galleries for conveyors, transfer towers and mechanical installation with total weight over 1200 t.

Construction of system for coal and limestone transporting and handling, installation of excavators and loading - unloading equipment

Read more ...

Object: "Sandvik Bulgaria" EOOD

Implementation period: 2009 - 2010

Scope: Installation of equipment for belt conveyors, complete installation of steel structures and equipment for transfer towers and excavators in mining industry.

Installation of mechanical equipment

Read more ...

Object: "Duropack Trakia Papir" AD

Implementation period: 2009

Scope: Equipment installation for production line of white testliner.

Construction of system for dry barking and transportation system for biomass

Read more ...

Object: "Mondi Stambolijski" EAD

Implementation period: 2008

Scope: Fabrication and erection of industrial equipment for barking system, fabrication and erection of barking drum, complete erection of industrial equipment along the system, galleries erection and equipment for belt conveyors for transportation and handling of biomass.

Reparation of existing filter

Read more ...

Оbject: "Vulkan Cement" AD

Implementation period: 2008

Scope: Reconstruction of existing filter of kiln №4 in cement plant "Vulkan Cement" - Dimitrovgrad.

Construction of industrial installations

Read more ...

Object: "Amilum Bulgaria" EAD

Implementation period: 2008

Scope: Structural steelwork, starch dryer, syrup lines, fabrication and erection of chimney stack, installation of gratings.

Belt conveyor installation

Read more ...

Object: "Geometal" EOOD

Implementation period: 2008

Scope: Belt conveyor installation PS 1600 mm. with length 560 m. for mining complex "Elatsite Med".

Installation of mechanical equipment

Read more ...

Object: "SBS Buhnentehnik" GmbH

Implementation period: 2008

Scope: Installation of mechanical equipment of down stage mechanization, revision, preventive maintenance and installation of existing equipment, fabrication and erection of steel structures.

Construction of new electrostatic precipitator for "Mondi Stambolijski" EAD

Read more ...

Оbject: "ELWO"

Implementation period: 2008

Scope: Fabrication of new electrostatic precipitator for project of "ELWO" - Poland for the needs of "Mondi Stambolijski" EAD.

Construction of new filter system

Read more ...

Оbject: "Fibran Bulgaria" AD

Implementation period: 2008

Scope: Design, fabrication and erection of system from bag filters for the needs of "Fibran Bulgaria" AD

Erection of fridge installation

Read more ...

Object: "Kamenitza" AD

Implementation period: 2008

Scope: Erection of fridge installation including fridge compressor, ammonia evaporator, evaporative condenser, etc.

Reconstruction of agregate АС72

Read more ...

Object: "Neochim" AD

Implementation period: 2007-2008

Scope: Structural steelwork.

Fabrication and construction of a new electrostatic precipitator for Mondi Stamboliyski EAD

Read more ...

Object: "FL Smidth"

Period: 2007

Scope: Fabrication and installation of a new electrostatic precipitator for the needs of Mondi Stamboliiski EAD, designed by FL Smidth Denmark.

Construction of installation for air separation

Read more ...

Object: "Linde Gas Bulgaria" EOOD

Implementation period: 2007

Scope: Mechanical installation works - complete performance of part "Mechanical - technological" installation of compressors, cooling column, vessels and equipment, pipelines and pumps.

Dismantle of structural steelwork from Germany and installation of the same in Bulgaria

Read more ...

Object: "Ceramics House" EOOD

Implementation period: 2006-2007

Scope: Dismantle of production lines for ceramic products from Germany, second installation in Bulgaria at the territory of the plant for ceramic products Straldja city.

Production and installation of electrostatic precipitator

Read more ...

Оbject: "Vulkan Cement" AD

Implementation period: 2006

Scope: Production of steel structures and parts for new electrostatic precipitator, construction and installation of electrostatic precipitator for project of "FL Smidth" Denmark.

Reparation of electrostatic precipitator

Read more ...

Оbject: "Energoremont Holding" AD

Implementation period: 2006

Scope: Reparation of electrostatic precipitator of boiler-aggregate №1 at TPP "Maritza East 2".

Erection of industrial installation and equipment

Read more ...

Object: "Energoremont Holding" AD

Implementation period: 2005

Scope: Construction of Condense- cleaning installation ( CCI ) of blocks №1 and №2 in TPP "Maritza East 2".