Object: Aurubis Bulgaria AD
Period: 2021
Scope: Production and installation of new load-bearing steel beams, restoration and rehabilitation of remaining steel and reinforced concrete elements, dismantling of existing load-bearing reinforced concrete panels.
Object: Ognyanovo-K AD
Period: 2020-2021
Scope: Production and installation of metal structure for control screening installation, including fabrication and installation of stairs, platforms and railings, corrugated sheet metal flooring, installation of roofing sheet metal.
Object: Imeris Minerals Bulgaria AD
Period: 2020
Object: Steel bridge over the Maritsa river
Period: 2019
Scope: Production and installation of load-bearing metal structures and individual elements for the reconstruction of a steel bridge, delivery and installation of flooring from lattice grills.
Project site: „Kronospan Bulgaria” EOOD
Year of completion: 2017
Scope of works: Overall dismantling, transportation and reinstallation of the wood crushing installation and conveyors.
Subject: Overall erection of sunflower oil refinery – structural steelwork, steel pipelines, equipment
Year of completion: 2016 - 2017
Scope of works: Overall erection of sunflower oil refinery which includes: installation of steelwork, technological carbon steel pipelines, stainless steel pipelines, Mechanical installation and overall electrical installation works.
Project site: „Aurubis Bulgaria” AD
Year of completion: 2016
Scope of works: Mounting of industrial steel structure, mounting of mechanical installation works and tanks, delivery and installation of technological steel pipelines, mounting of insulation and cladding on the different type of equipment.
Project site: "Zaharni Zavodi“АD
Year of completion: 2016
Scope of works: Delivery and installation of stainless steel pipelines, mechanical installation, certification of stainless steel vessels.
Object: "New Oil" AD
Implementation period: 2014-2015
Scope: Structural steelwork - elevators, screws, redlers, hoppers and inflows, separators, stubble cleaner, sunflower press, precipitants and filters for raw oil, pumps, etc.
Object: "Linde Gas Bulgaria" EOOD
Implementation period: 2013
Scope: Structural steelwork installation and vessels for gaseous oxygen production installation at the territory of "KCM" AD.
Object: "Evricom" EOOD
Implementation period: 2013
Scope: Delivery, installation and commissioning of Structural steelwork - mixing block, production line for cutting wax mixtures, stainless and carbon steel pipelines.
Object: "FLSmidth Airtech" A / S
Implementation period: 2013
Scope: Production of sheet and profile metal structures for gas ducts, compensators, gas duct supports for electrostatic precipitators.
Object: "KCM" AD
Implementation period: 2012-2014
Scope: Complete performance of part "Mechanical-technological", installation of kiln, boiler, burners, vessels, gasducts and dust-collection equipment, condensers and deairators, all steel pipelines, pumps and fitting.
Project site: „Maritza Olio“ АD
Year of completion: 2012
Scope of works: Implementation of complex installation of mechanical installation works, carbon (black) steel pipelines, stainless steel pipelines, fire-extinguishing installation, hexane storage tanks, Electrical installation works.
Оbject: "KCM Technology" EOOD
Implementation period: 2012
Scope: Production and installation of new electrostatic precipitator for the needs of "KCM" AD, according to project of "FL Smidth" - Denmark.
Object: "Gips" AD
Implementation period: 2011
Scope: Structural steelwork - screws, redlers, elevators, specialized equipment, hoppers, silos and inflows.
Object: "Ognyanovo-K" AD
Implementation period: 2011
Scope: Fabrication and erection of nonstandard equipment - limestone kiln and its attached equipment, hoppers, silos, valves, filters, steel pipelines.
Object: "Sandvik Bulgaria" EOOD
Implementation period: 2009 - 2010
Scope: Erection of steel structures for galleries for conveyors, transfer towers and mechanical installation with total weight over 1200 t.
Object: "Sandvik Bulgaria" EOOD
Implementation period: 2009 - 2010
Scope: Installation of equipment for belt conveyors, complete installation of steel structures and equipment for transfer towers and excavators in mining industry.
Object: "Mondi Stambolijski" EAD
Implementation period: 2008
Scope: Fabrication and erection of industrial equipment for barking system, fabrication and erection of barking drum, complete erection of industrial equipment along the system, galleries erection and equipment for belt conveyors for transportation and handling of biomass.
Object: "Amilum Bulgaria" EAD
Implementation period: 2008
Scope: Structural steelwork, starch dryer, syrup lines, fabrication and erection of chimney stack, installation of gratings.
Оbject: "ELWO"
Implementation period: 2008
Scope: Fabrication of new electrostatic precipitator for project of "ELWO" - Poland for the needs of "Mondi Stambolijski" EAD.
Оbject: "Fibran Bulgaria" AD
Implementation period: 2008
Scope: Design, fabrication and erection of system from bag filters for the needs of "Fibran Bulgaria" AD
Object: "FL Smidth"
Period: 2007
Scope: Fabrication and installation of a new electrostatic precipitator for the needs of Mondi Stamboliiski EAD, designed by FL Smidth Denmark.
Object: "Linde Gas Bulgaria" EOOD
Implementation period: 2007
Scope: Mechanical installation works - complete performance of part "Mechanical - technological" installation of compressors, cooling column, vessels and equipment, pipelines and pumps.
Оbject: "Vulkan Cement" AD
Implementation period: 2006
Scope: Production of steel structures and parts for new electrostatic precipitator, construction and installation of electrostatic precipitator for project of "FL Smidth" Denmark.
Оbject: "Energoremont Holding" AD
Implementation period: 2006
Scope: Reparation of electrostatic precipitator of boiler-aggregate №1 at TPP "Maritza East 2".