Construction of a production building with storage space

Object: Metalstroy AD

Period: 2019 - 2020

Scope: Installation of metal structures for production building and metal warehouse, installation of roof and wall thermal insulation panels and finishing kits.

 

 

20190607_143730
20190607_170357
20190610_073607
20190610_073634
20190610_073726
20190610_073827
20190613_083936
20190613_084625
20190613_084641
20190613_085309
20190613_085316
img_20200306_125543