Construction of a new steam boiler installation at a plywood production plant


Object: Velde Bulgaria AD

Period: 2019 - 2020

Scope: Partial dismantling and demolition of an old boiler room, execution of earthworks and concrete works, manufacture and installation of 110 tons of supporting metal structure for technological equipment, production of 200 tons of metal structure for boiler room.

 

img_20191022_105221
img_20191022_111049
img_20191022_114155
img_20191113_134540
img_20191113_134625
zag